OPS 571T Apply Week 3 Exam Assignment100% Correct (All Possible Question/Answer)
$9.00

OPS 571T Apply Week 3 Exam Assignment100% Correct (All Possible Question/Answer)

This Tutorial was purchased 4 times & rated A by student like you.

 

This Tutorial contains following Attachments

  • OPS 571 Apply Week 3 Exam Assignment (1).docx

In the textbook, the expression "quality at the source" means that we need to purchase the best quality a supplier or vendor can provide. Is it true or not? Lean production makes implementing green strategies in manufacturing processes more difficult. Is it true or not? A principle of value stream mapping is to concentrate on speeding up value-added operations. Is it true or not? Value stream mapping involves materials, not information. Is it true or not? OPT stands for optimal purchasing technique. Is it true or not? Respect for people is a key to Toyota's improvement ideas in manufacturing. Is it true or not? Respect for people is a key to Toyota's improvement ideas in manufacturing. Is it true or not? According to the theory of constraints, which of the following is a kind of time that makes up the cycle time in production? Is it true or not? To develop a lean manufacturing system a firm might do which of the following? A way to find a bottleneck is to use one's knowledge of a particular plant, look at the system in operation, and talk with supervisors and ---------- A process batch should be no larger than the transfer --------- Lean production is a management philosophy and a pull system throughout the plant. Is it true or not? Departments within a firm often are at odds with each other because reward systems are often not synchronized with the basic goal of the firm: to make ------- A kaizen burst is an overfilled -------- On an assembly line, a transfer batch can be one ------- According to the theory of constraints, the term "productivity" is defined as all those actions that bring a company closer to its goals. Is it true or false? One way to find a bottleneck is to run a capacity resource-------- In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated? To implement a flow process in developing a lean system a firm might do which of the following? JIT is typically applied to-------------- The effects of statistical variations in processing times in a dependent sequence will eventually cancel themselves out due to the law of -------------- One of the aims of value stream mapping to eliminate waste in a ---------------- Firms in Japan tend to have short-term relationships with their suppliers and customers. Is it true or false? In a process sequence where a product flows from process A to process B, process B is called the contingent--------------- Which of the following is a negative aspect of JIT compared to synchronous manufacturing? The term "freeze window" refers to the practice of building quality into the process and not identifying quality by inspection. Is it true or not? According to the theory of constraints, it is wrong for manufacturers to try to match capacity with demand by attempting to balance capacity across a sequence of processes. Unbalanced capacity is better. Is it true or not? 3.JIT is typically applied to non-repetitive manufacturing. Is it true or not? 4.JIT requires a stable production level. When compared to synchronous manufacturing, this is viewed as a negative aspect of JIT. Is it true or not? In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated? In implementing a lean production system, you should work with suppliers to do which of the following? According to the theory of constraints, a bottleneck is any resource whose capacity is greater than the demand placed on it. Is it true or not? Company unions in Japan exist to foster a cooperative relationship with management. Is it true or not? Value stream mapping involves materials, not information. Is it true or not? According to the theory of constraints, throughput is the rate at which product is passed through the manufacturing system. Is it true or not? One of the many lean techniques that have been successfully applied in service firms is leveling facility load. Is it true or not? According to the theory of constraints, a non-bottleneck is any resource where capacity is less than the demand placed on it. Is it true or not? One of the many lean techniques that have been successfully applied in service firms is the eliminating of unnecessary activities. Is it true or not? Applying lean concepts to logistics is difficult unless either the manufacturer or the customer owns the logistics activities. Is it true or not? In Japanese manufacturing, automation and robotics are used extensively to perform dull or routine jobs so employees are free to focus on important improvement tasks. Is it true or not? Which of the following is a negative aspect of JIT compared to synchronous manufacturing? The goal of JIT production is to drive all inventory queues lower. Is it true or not? Lean production requires a "push and pull" system of inventory replenishment. Is it true or not? A way to find a bottleneck is to use one's knowledge of a particular plant, look at the system in operation, and talk with supervisors and workers. Is it true or not? Synchronous manufacturing refers to the entire production process working together in harmony to achieve the goals of the firm. Is it true or not? You have been called in as a consultant to set up a Kanban control system. The first thing to do is to determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25 percent of the demand during lead time. The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary to support this situation. You found that the number of Kanban cards needed is 47. Your client now tells you that they miscalculated the demand and the true demand is 300 per hour. All other things remain the same. What is the most appropriate answer from the choices below? In setting up a kanban control system you need to determine the number of kanban card sets needed. If the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the number of kanban card sets is needed? The "dollar days" inventory measurement can be used in purchasing to discourage large work-in-process and producing earlier than is needed. Is it true or not? You have been called in as a consultant to set up a Kanban control system. The first thing to do is to determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25 percent of the demand during lead time. The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary to support this situation? In a process sequence where a product flows from process A to process B, process B is called the contingent process. Is it true or not? What terms refers to a schedule that pulls material into final assembly at a constant rate? What term refers to the optimization of value-adding activities and elimination of nonvalue-adding activities that are part of a value system? What is the name of the software Goldratt developed to implement his idea of TOC? What are the three financial measurements necessary to adequately measure a firm’s performance? Which of the following are related to lean production? In a setting up Kanban control system you need to determine the number of Kanban card sets needed. If assume the expected demand during lead is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed? Which of the following is a lean production technique that has been successfully applied in service firms? Which of the following is a “focusing step” of Dr. Eli Goldratt’s theory of constraints? According to the theory of constraints, which of the following can be a CCR? Which of the following is a negative aspect of JIT compared to synchronous manufacturing? Group technology (GT) is credited with which of the following benefits? In Japanese manufacturing, automation and robotics are used extensively to perform dull or routine jobs so employees are free to focus on important improvement tasks. Lean production replaced JIT in the 1990s because JIT did not address the problem of reducing waste. In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated? The operational measure of throughput is "the rate at which money is generated by the system through production of goods and services that might be sold." Is it true or not? Kanban means "symbol" or "box" in Japanese. Is it true or not? In a lean production system, we expect to see which of the following? production is a management philosophy and a pull system throughout the plant. Is it true or not? According to the theory of constraints, the term "productivity" is defined as all those actions that bring a company closer to its goals. Is it true or not? In setting up a kanban control system you need to determine the number of kanban card sets needed. If the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the number of kanban card sets is needed? Applying lean concepts in manufacturing balances increases in cost with quality improvement. Is it true or not? Value stream mapping is used to visualize product flows through various processing steps. Is it true or not?

Write a review

Order Id


Order Id will be kept Confidential
Your Name:


Your Review:
Rating:   A   B   C   D   F  

Enter the code in the box below:



Related Tutorials
$10.00

This Tutorial was purchased 3 times & rated A+ by student like you.

1. Concept development is one of the typical phases of product development. True 2. Ecodesign replaces one or more of the other requirements considered in the design process. 3. Sensitivity analysis of the base-case financial model is a useful tool for which of the following reasons? ..
$7.00

This Tutorial was purchased 7 times & rated A+ by student like you.

The Tuff Wheels was getting ready to start its development project for a new product to be added to their small motorized vehicle line for children. The new product is called the Kiddy Dozer. It will look like a miniature bulldozer, complete with caterpillar tracks and a blade. Tuff Wheels has forec..
$9.00

This Tutorial was purchased 3 times & rated No rating by student like you.

1. Utilization of a production process is the ratio of output to input 2. Benchmarking refers to the practice of comparing the production metrics of one firm with the production metrics of another. 3. One of the tools common to all quality efforts is leadership. 4. Which of the followin..
$7.00

This Tutorial was purchased 3 times & rated A+ by student like you.

1.What is the term that means making the person who does the work responsible for ensuring that specifications are met? 2.What are the four general categories of quality costs? 3.A process flowchart uses which of the following symbols to represent a decision point in a flow diagram? 4.To re..
$7.00

This Tutorial was purchased 3 times & rated A+ by student like you.

JIT manufacturing forces the firm to work with a lower water level despite safety hazards. Is it true or not? An MRP system can allow for product rejects by building a larger batch than is demanded but at JIT system cannot tolerate poor quality. Is it true or not? An MRP system can allow for p..
$9.00

This Tutorial was purchased 5 times & rated A by student like you.

1. The fact that organizations are flattening is one of the reasons that project management is important 2. Derivative projects are those that address incremental changes to products or processes. 3. A disadvantage of a matrix project organizational structure is that a project manager is hel..
$6.00

This Tutorial was purchased 4 times & rated A+ by student like you.

1. What type of chart compares the current project schedule with the original baseline schedule so that deviations from the original plan can be easily noticed? 2. What are the four major categories of project based on the area undergoing change? 3. In a Gantt chart, the horizontal axis is..
$9.00

This Tutorial was purchased 2 times & rated No rating by student like you.

Random errors can be defined as those that cannot be explained by the forecast model being used. Is it true or false? Customer contact refers to creation of the service. Is it true or false? Which of the following considerations is not a factor in deciding which forecasting model a firm ..
$6.00

This Tutorial was purchased 3 times & rated A+ by student like you.

Which of the following forecasting methods is very dependent on selection of the right individuals who will judgmentally be used to actually generate the forecast? Which of the following refers to the physical presence of the customer in a service system? Which of the following considered..
$9.00

This Tutorial was purchased 4 times & rated A+ by student like you.

Services typically have multiple site locations to maintain close contact with customers. The optimal strategy for functional products is to use an efficient supply chain. The effect of the lack of synchronization among supply chain members is referred to as which of the following? In fac..
$7.00

This Tutorial was purchased 0 times & rated A+ by student like you.

If the average aggregate inventory value is $1,200,000 and the cost of goods sold is $600,000, which of the following is inventory turnover? If the average aggregate inventory value is $45,000 and the cost of goods sold is $10,000, which of the following is weeks of supply? Facility location analy..
$3.00

This Tutorial was purchased 4 times & rated A by student like you.

OPS 571T Week 1 Discussion Product Design Philosophy Respond to the following in a minimum of 175 words: • What are the product design philosophies behind industrial design and design for manufacture and assembly? Which one do you think is more important in customer-focused product development? •..
$3.00

This Tutorial was purchased 7 times & rated No rating by student like you.

OPS 571T Week 2 Discussion ISO Certification Respond to the following in a minimum of 175 words: • Is certification under the ISO standards necessary for competing in the modern market? What should companies consider when deciding whether to become certified? • Provide an example of ISO certific..
$3.00

This Tutorial was purchased 5 times & rated A by student like you.

OPS 571T Week 3 Discussion Theory of Constraints Respond to the following in a minimum of 175 words: • Describe an example where theory of constraints (TOC) was successfully applied to improve a process, or where you saw the potential for TOC to improve the process, in either a company you worked ..
$3.00

This Tutorial was purchased 5 times & rated A+ by student like you.

OPS 571T Week 4 Discussion Project Management Consider the most complex project you have been involved in. Respond to the following in a minimum of 175 words: • Briefly describe the project. Give examples of the following as they pertain to the project: • the work breakdown structure • tasks • ..
$3.00

This Tutorial was purchased 3 times & rated A+ by student like you.

OPS 571T Week 5 Discussion Forecasting Respond to the following in a minimum of 175 words: • How has the development of the internet affected the way companies forecast in support of their supply chain planning process? • Provide an example of a successful or unsuccessful forecast. Due Monday R..
$3.00

This Tutorial was purchased 3 times & rated No rating by student like you.

OPS 571T Week 6 Discussion Facility Location Respond to the following in a minimum of 175 words: • If you were starting a new software development company and could locate it anywhere in the world, which place would you choose? • Provide an explanation of the variables you would consider in sel..
$50.00

This Tutorial was purchased 5 times & rated A by student like you.

OPS 571T Apply Week 1 Exam Assignment 100% Correct (All Possible Question/Answer) OPS 571 Week 1 Practice 100% Correct (All Possible Question/Answer) OPS 571T Apply Week 2 Exam Assignment 100% Correct (All Possible Question/Answer) OPS 571T Week 2 Practice100% Correct (All Possible Question/Answe..